Register here for news & updates!
Email:

News


Innovative Pipe systems Header Strip


Aquatherm Innovative & Sustainable Strip Resize

 

Hanlon plumbing HVAC team on site installing Climatherm for Economech Services at the new East Quadrant building downtown Auckland.

 

Hanlons 1hanlons

 



Aquatherm Innovative & Sustainable Strip Resize

 

 

Taranaki Hospital

 

Innovative fusiotherm manifolds to SHT application in the Hot and Cold water reticulation at the new Taranaki Base Hospital from Warwick Muirhead and the team at David Browne Contracting (picture above)

David Browne Contractors recent Fletchers installation involving the new large dimension compact stub flange valves, we will post a more comprehensive article on the industrial application shortly. (picture right)

           

David Browne

       

 



Aquatherm Innovative & Sustainable Strip Resize

 

The new Fisher and Paykel health care project at East Tamaki that is nearing completion. Pictured here is part of the vast high ceiling chilled water, compressed air and process lines installation by Economech Services in Climatherm, as well Michael Gilmore Economech site engineer on site at one of the many large plant rooms.  We will post shortly an article on this massive project including fusiotherm plumbing with W H Chenery and fire stop hose reel innovation.

 

 

Fisher & Paykel Man                         Fisher & Paykel Pipes

 

 



Aquatherm Innovative & Sustainable Strip Resize

 

 

Baptist Hospital project developed over multiple stages, incorporating fusiotherm and Lilac for potable and non potable clear identification throughout the building. Peter Illingworth and his team have been on this project and have as well just recently completed the Iconic Tepid Baths fusiotherm® installation.

 

Tepid bath1914 Tepid baths 1914 Baptist Hospital

Tepid Baths 1914

Tepid Baths 2012

Baptist Hospital

The Tepid baths were completed in 1914. There were two pools one for men and one for women. The mens pool 100 feet in length , being 40 feet bigger than the womens. Seating around the around the gentlemens pool had the capacity to seat 450 people. An amazing 30,000 admissions with in the first six weeks of opening.



Aquatherm Innovative & Sustainable Strip Resize

Bassett plumbing have multiple fusiotherm projects underway currently in the upper North Island, a good example of clear identification on cold water mains, blue stripe, stickers and correct clipping.

 

              

 

Basset Plumbing      

 



New aquatherm Products

aquatherms climasystem a ecological and economical - the modern way to heat.

High heating costs, raisings of dust, allergies, unfavourable distribution of temperature, high flow temperatures, required space for radiator - all this can be resolved, with architectural freedom by the aquatherm climasystem.

The system is in a compact grid constuction for hydronic heating and cooling as well, this system has really taken off in Europe in both residential and commercial applications.  It can be installed simply behind the gib board in both walls and ceiling. Install cost are low and response from radiant heating and cooling is incredible efficient.

Click the link or visit our download section to view. We will be posting more information shortly regarding the release of this product in New Zealand

 

        

Climasystem E20100

Climasystem E20100  

 

The new aquatherm green pipe MF SDR9 RP

aquatherm set the innovation standards in the production of PP-R pipes and fittings worldwide. We are continually pushing developments for product improvement. The current evolution is called fusiolen PP-RP.

With  fusiolen PP-RP we can produce fibre-composite pipes with lower wall thickness by keeping all the well-established advantages.

The new aquatherm SDR 9 catalogue is here. Click the link or visit our downloads section to view. We will be posting more information regarding the release of this product to New Zealand installers, for the replacement of SDR 7.4 faser.

 

 

 

            

          

SDR9

SDR 9



Aquatherm Innovative & Sustainable Strip Resize

New Plastic Ball valves

As of June we will change to new plastic ball valves. The service conditions are identical to the old ball valves which will still be delivered until their complete sale.

20 mm - 63 mm

                    Ball Valve Plastic


Aquatherm Innovative & Sustainable Strip Resize
Green Build

Green Builder magazine is the fastest growing publication in the residential building industry. The magazine blends visionary editorial content with sophisticated design to generate an unforgettable publication that addresses the most important issues of our time. Green Builder magazine enables building professionals to dramatically enhance their credibility, increase their profitability, and improve the quality, performance and value of their building projects.

Whether for potable water (Greenpipe) or greywater (Lilac) systems. Aquatherm Piping is a safe and permanent water delivery solution.

Aquatherm Piping

Color-coded piping makes water management much more practical. Aquatherm's polypropylene piping is designed for specific tasks. Greenpipe, for example, is highly stable, made for potable water. Climatherm is engineered for chilled water, hydronic heating and industrial applications. Lilac is specifically designed for rainwater and greywater distribution. Like Greenpipe, Lilac is fused at all joints with Aquatherm Greenpipe fittings.



Newsletter Archives

15 Jun 11: Greenline June 2011
14 Dec 10: aquatherm Greenline - December
10 Dec 10: A Christmas card from aquatherm NZ Ltd
29 Sep 10: aquatherm - Greenline September 2010
16 Jun 10: aquatherm Greenline Newsletter
10 May 10: Territory and Personnel Changes at aquatherm
07 Dec 09: aquatherm NZ Ltd - Greenline Newsletter - December 2009
17 Sep 09: Greenline Newsletter September 2009


PDF Newsletter Archives

Greenline May 2009 (6.7Mb)
Greenline Oct 2008 (2.0Mb)